SEISMIC CONSIDERATION

Considering Zone-IV, Earthquake resistance RCC framed construction

LIVING, DINING & LOBBY/PASSAGE

Floor         Vitrified tiles
Walls Gypsum plaster with paint.
Ceiling Pleasing shades of OBD

BEDROOMS

Floor Wooden laminated in 2 bedrooms & vitrified tiles in remaining    bedrooms
Walls Pleasing shades of OBD, one wall different colour.
Ceiling OBD
Wardrobe         Wardrobe in master bedroom

BALCONIES

Floor                 Antiskid ceramic tiles
Walls          Permanent paint finish
Ceiling          Permanent paint finish

SERVANT ROOM

Floor         Terrazo / Ceramic tiles
Walls         OBD
Ceiling       OBD

ELECTRICAL

Copper Electrical wiring throughout in connealed conduit with provisions for light point, power 
point, TV & phone sockets with protective MCBs. Modular switches.
SECURITY SYSTEM / FIRE FIGHTING SYSTEM
Single Entrance & Exit, gated community. CCTV common areas. Fire Fighting System.

CLUB FACILITY

Club House, Health Club, Swimming pool etc.

KITCHEN

Floor            Antiskid ceramic tiles.
Walls   Ceramic tiles up to 2 feet above counter & OBD in balance area
Counter   Chinaware matching with the WC
Fitting / Fixtures   Standard: WC & wash basin, CP fittings

DOORS

Internal    Moulded skin doors / skin shutters
Entrance Doors            Teak laminated shutter / male mine finished doors
External doors & Windows Aluminium / U.PVC